New Turbogas in simple cycle-Porto Empedocle Power Plant
Main civil works for the new simple cycle gas turbine at the Porto Empedocle (AG) Power Plant.
Main civil works for the new simple cycle gas turbine at the Porto Empedocle (AG) Power Plant.
Execution of the main civil works (foundations, structures and buildings) in the ENEL thermoelectric plant in Porto Empedocle (AG), preliminary to the installation of a new single-fuel single-cycle gas turbine plant with a total power of approximately 70 MW.
Works performed by the company:
1. Turbogas and Alternator Foundation;
2. Chimney Foundation and square paving;
3. TG disassembly bridge crane canopy, foundation;
4. Industrial Services Building, foundation;
5. Pipe racks, foundations;
6. Transformers – Reuse of existing structures for 3TP, Main Transformer, 3TU, Unit Transformer, TAG, Auxiliary Transformer;
7. Bases: emergency diesel, emissions monitoring, fire pumps, TG panels;
8. Foundations of drinking water (250 cubic meters), demi and industrial water tanks;
9. Methane gas compression station area, compressor foundation included;
10. Methane gas compression station area, compressor foundation included Rainwater, acid and oily water tanks;
11. small carpentry and repairs
12. Streets and squares.
Of particular importance are also the improvement and containment interventions carried out preliminary and functional to the realization of the works under contract, such as the improvement of the geotechnical characteristics of the ground through Vibroflottazione (for the TG and Chimney foundations) and execution of containment works of deep excavations with sheet piles.
CLIENT: Enel S.p.A.
PLACE: Porto Empedocle (AG)
START OF THE WORK: 01/12/2013
END OF THE WORK: 31/12/2014
WORK AMOUNT: € 7.520.000
MAN HOURS: 125.000
CONCRETE CASTINGS: 9.500 mc
REINFORCING STEEL: 820.000 kg