Marcinelle CCGT Power Plant – Civil works
Main and secondary civil works for the realization of the CCGT Plant of Marcinelle (Charleroi) in Belgium.
Main works:
Execution of excavations, embankments and earth movements; construction of foundations and structures in reinforced concrete for buildings; construction of foundations for pipe-racks, systems and metal structures and various foundations and for tanks; construction of basins; grouting; installation of doors and fixtures, construction of hydro-sanitary systems and other underground networks; installation of external lighting systems, electrical systems in buildings, grounding systems, telephone systems, data transmission systems and television circuits, lifting systems and elevators; construction of road works.
Secondary and finishing civil works:
Execution of excavations, embankments and earth movements; Landscaping and green works; construction of foundations and structures in reinforced concrete, construction of roads and squares, underground networks; assembly of fences and gates.
CLIENT: ENEL S.p.A.
PLACE: Mercinelle Chrleroi – Belgium
START OF THE WORK: 03/2009
END OF THE WORK: 10/2011
WORK AMOUNT: € 13.740.000
CONCRETE CASTINGS: 15.000 mc
REINFORCING STEEL: 1.300.000 kg