ENEL S.P.A. TRINO LOGISTICS CENTER(VC)
EPC realization of the Logistic Center of Trino(VC)
Turnkey construction of the Trino logistic hub including the supply, construction and detailed design of all the necessary and functional works planned for the structure.
The Logistics Center will be used for the storage and management of the materials used by ENEL in its production cycle and is composed of:
CLIENT: ENEL S.P.A.
PLACE: Trino Logistics Center (VC)
START OF THE WORK: 12/2017
END OF THE WORK: 31/07/2020
WORK AMOUNT: 8.340.000
MAN HOURS: 80.000
METERS OF SHED BUILT: 15.000M
METER OF SQUARE BUILT: 50.000M2