Mochovce nuclear power plant

Renovation, upgrading and completion of the nuclear auxiliary services building of the 2nd power block - Construction of the common diesel generating station and the internal railway connection in the conventional island Unit 3-4 - Plates and anchoring in the nuclear and conventional island.

https://www.solesi.it/wp-content/uploads/2021/01/foto-1-copertina.png
https://www.solesi.it/wp-content/uploads/2021/01/foto-2-1.jpg
https://www.solesi.it/wp-content/uploads/2021/01/foto-3.jpg
https://www.solesi.it/wp-content/uploads/2021/01/foto-4.jpg

Project: Mochovce nuclear power plant

Title:

Description:

Mochovce nuclear power plant

Renovation, upgrading and completion of the nuclear auxiliary services building of the 2nd power block - Construction of the common diesel generating station and the internal railway connection in the conventional island Unit 3-4 - Plates and anchoring in the nuclear and conventional island.

https://www.solesi.it/wp-content/uploads/2021/01/foto-1-copertina-540x540.png
https://www.solesi.it/wp-content/uploads/2021/01/foto-2-1-540x540.jpg
https://www.solesi.it/wp-content/uploads/2021/01/foto-3-540x540.jpg
https://www.solesi.it/wp-content/uploads/2021/01/foto-4-540x540.jpg

Main work made

Solesi S.P.A. operated for about 7 years in one of the largest nuclear power plants located in Mochovce, Slovakia. The activities carried out by our company were carried out in more than 40 buildings and inside over 1,000 rooms, including Conventional Island (Turbine Hall Unit 3 & Unit 4; transverse and longitudinal buildings for both Units 3 & 4) and Island nuclear power (Reactor Building Units 3 and 4; Auxiliary Building-BAPP). Other activities were carried out outside and in newly expanded areas.

Here are some of the main works carried out within the nuclear power plant:

  • installation of plates and anchor points in the nuclear reactor building, in the auxiliary building, in the conventional island;
  • civil works in the buildings of the reactor and the auxiliary building, such as screeds, foundations, seismic reinforcements, resin floors;
  • civil works in the conventional island, or waterproofing of wells and basins; renovation of existing buildings;
  • construction of a new Common Diesel GS building;
  • construction of a new internal railway;
  • construction of new steel and reinforced concrete structures;
  • wells and canals;
  • completion of the flooring in Turbine Hall;
  • steel cladding on the floor of room A122 and Completion of the fire prevention network in the nuclear reactor building;
  • rehabilitation and waterproofing of concrete surfaces of the central pumping station for non-essential service water;
  • renovation and completion of the glass facade, reactor building, and roof renovation in the auxiliary building;
  • construction of water and sanitary systems.

In 2015, the Site reached a peak of over 200 people involved for approximately 1,500,000 hours of work performed by Solesi S.p.A ..

CLIENT: Slovenské elektrárne, a.s.
PLACE: Mochovce – Slovakia
START OF THE WORK: 07/2013
END OF THE WORK: 31/03/2020
AMOUNT OF THE WORK: 49.000.000
MAN HOURS: 1.500.000


Sede legale

Via Stentinello, 9 int. 13
96100 Siracusa
Tel.: 0931/751411
Fax: 0931/756944
Email: solesi@solesi.it

Sede commerciale

Via Carlo De Angeli, 3
20141 Milano Tel.: 02/6694125
Fax: 02/6694145
Email: solesi.milano@solesi.it

Branch estere

Belgium Branch - Brussels
Denmark Branch - Roskilde
France Branch - Lyon
Poland Branch - Poznan
Slovakia Branch - Bratislava

Gruppo irem

Via Stentinello, 9
96100 Siracusa
Tel.: 0931/787011
Fax: 0931/756875
Email: irem@iremspa.it